Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: Status of BOM Terminal 1B


Member

Status: Offline
Posts: 318
Date:
Status of BOM Terminal 1B
Permalink Closed


First phase of remodelling the terminal 1B at BOM was completed in July 2005. What is the progress on the second phase? Are 9W, S2 and DN still using the arrivals section of terminal 1A?

__________________


Member

Status: Offline
Posts: 527
Date:
Permalink Closed

Yes, these airlines are still using the arrivals area of Terminal 1A. However, the second half of the departures area was thrown open a couple of days ago. This has almost doubled the number of check-in counters that existed earlier.

__________________


Member

Status: Offline
Posts: 48
Date:
Permalink Closed

 


Only check-in area is complete. The security hold and arrival side has to be refurbished yet.


 



__________________
bhargavirk@gmail.com


Member

Status: Offline
Posts: 318
Date:
Permalink Closed


Bhargavi wrote:

 
Only check-in area is complete. The security hold and arrival side has to be refurbished yet.
 




Have they started working on the arrivals and security hold?

__________________


Member

Status: Offline
Posts: 48
Date:
Permalink Closed

 


Yep, they have. It will take at least three more months to complete that. But smart guys give importance only to decorative aspect. I am not sure that all the facilities will be provided.


bhargavi



__________________
bhargavirk@gmail.com


Member

Status: Offline
Posts: 1632
Date:
Permalink Closed

Still a lot of Work Pending.Its moving very Slowly.


regds


MEL



__________________
Think of the Brighter Side !!!


Member

Status: Offline
Posts: 298
Date:
Permalink Closed

 


So watz the game plan do they intend to use these new eye pleasing terminals in the new airport or terminals which they want to set up ?



__________________
Friend in need is a Friend indeed


Member

Status: Offline
Posts: 2450
Date:
Permalink Closed

BTW which company is renovating 1B surely its not GVK or GMR (whoever won MIAL bid)

__________________
Light travels faster than sound...thats why people appear bright, until you hear them talk!


Member

Status: Offline
Posts: 48
Date:
Permalink Closed

 


Right 380. Unity Infra projects is the company.


The 1-B terminal was scheduled to be complete by April 2006. Due to intervention of MIAL, it's delayed by six months.


http://www.dnaindia.com/report.asp?NewsID=1034106



__________________
bhargavirk@gmail.com


Member

Status: Offline
Posts: 2450
Date:
Permalink Closed

gr8 article bhargavi


rgds


the_380



__________________
Light travels faster than sound...thats why people appear bright, until you hear them talk!


Member

Status: Offline
Posts: 48
Date:
Permalink Closed

 


Thanks 380, for the compliments


bhargavi



__________________
bhargavirk@gmail.com


Member

Status: Offline
Posts: 298
Date:
Permalink Closed

 


 So Unity Infra has hired Hafeez Contracter to design the stuff is it?



__________________
Friend in need is a Friend indeed


Member

Status: Offline
Posts: 48
Date:
Permalink Closed


Yep. He was criticised by the AAI authorities- beautification is not attaining high standards. There were incidents that were of gravity. The earlier lighting system was replaced. Floor lighting system proved dangerous as a passenger's bag caught fire at airport in mid 2005. 


 


 


 



__________________
bhargavirk@gmail.com


Member

Status: Offline
Posts: 1632
Date:
Permalink Closed

Nice link.


regds


MEL



__________________
Think of the Brighter Side !!!


Member

Status: Offline
Posts: 527
Date:
Permalink Closed

Good article. Yes, a food court was sorely needed here. Currently, there was only one restaurant - SkyCafe which is tiny and does not have much variety. Any idea how many new restaurants/cafes have opened at 1B?


I wonder why companies like Mc Donald's, KFC, Subway, etc do not set up shop here!!



__________________


Member

Status: Offline
Posts: 2450
Date:
Permalink Closed

Well then people wud miss their flights especially when they have children along

__________________
Light travels faster than sound...thats why people appear bright, until you hear them talk!


Member

Status: Offline
Posts: 1632
Date:
Permalink Closed

The Sale would be limited.Unless its open to Outside People too,but then In comes Security Risk.


regds


MEL



__________________
Think of the Brighter Side !!!


Member

Status: Offline
Posts: 527
Date:
Permalink Closed

Mel, I think the sale would be good. Anyone would prefer a Mc Donald's burger priced anywhere betn 20-50Rs as compared to a dumb chicken puff priced at 30-40Rs at the SkyCafe.


Ive seen massive crowds at the KFC & Mc Donalds outlets at BKK airport. Just imagine the crowd there especially the ones flying the LCCs. I will for sure buy a Mc D's burger or a Subway sandwich rather than having the cold samosas and sandwiches sold on-board.


What do you think?



__________________


Member

Status: Offline
Posts: 1632
Date:
Permalink Closed

The Operating counters + Salaries + Rent should be worth it.


regds


MEL



__________________
Think of the Brighter Side !!!


Member

Status: Offline
Posts: 2450
Date:
Permalink Closed

I too feel the biz wud be brisk especially in rush hours even other time they wont be empty but the problem is that for intl. and dom. even different terminals they will need to have seperate outlets which works out more expensive unless some better solutions are there

__________________
Light travels faster than sound...thats why people appear bright, until you hear them talk!
Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.

Tweet this page Post to Digg Post to Del.icio.us


Create your own FREE Forum
Report Abuse
Powered by ActiveBoard